Case Study

41 James St, Burleigh Heads

Full-service concrete grinding and surface preparation for a premium commercial fitout at 41 James St, Burleigh Heads.

ICGC team walking across a large commercial space during concrete grinding preparation on the Gold Coast
Video Coming Soon

Location

41 James St, Burleigh Heads

Sector

Commercial Retail Fitout

Services

Grinding, Surface Prep, Dust-Free

Duration

Multi-stage

The Challenge

A Premium Space Demands a Perfect Slab

The 41 James St fitout in Burleigh Heads required concrete floor preparation across a large commercial space with exposed brick walls and multiple zones. The existing slab had surface imperfections, adhesive residue, and uneven areas that needed to be resolved before the next trades could begin.

The fitout was on a tight programme, so the client needed a single contractor who could handle grinding, surface preparation, and dust management without holding up the build.

The Solution

One Team, Complete Floor Preparation

ICGC deployed a full crew with Husqvarna planetary grinders, edge grinders, and industrial HEPA-filtered dust extraction. The entire process was dust-free from start to finish, critical in a space where other trades were working concurrently.

  • Concrete grinding and levelling across the full floor area
  • Adhesive and residue removal back to clean concrete
  • Edge grinding along all walls and columns
  • Surface profiling for subsequent coatings and finishes
  • Dust-free process with HEPA extraction throughout
ICGC team members walking through a large commercial space being prepared for concrete grinding

Dust-Free Process

Clean Sites, No Exceptions

The Result

Ready for the Next Trade

The entire floor area was ground, levelled, and profiled to the correct specification. Ready for the fitout team to proceed with coatings, tiling, and finishing works without delay.

Because ICGC handled grinding, adhesive removal, and surface prep as a single scope, there was no coordination between multiple subcontractors. One team, one programme, delivered dust-free throughout.

“ICGC made it easy. One call, one team, and the floor was ready exactly when we needed it. No dust, no drama.”

- Project Manager, 41 James St Fitout